They reviewed the civil works that was done by local contractors that it was according to their designs. We are very happy that the steel beams fit snugly with the embedded foundation joints (J-bolts).
2012-01-07 13.08.30
steel structures installation
2012-01-07 13.00.11
Steel structures installation
2012-01-05 07.59.39
Steel structures installation. The overseas contractor engineers arrived on Friday 5 April and started work at Faafan site on Sunday 7 April
2012-01-05 05.36.02
Final touches on the foundation
Photo0495
Ongoing road construction that will service the facilities
Photo0494
Ongoing road construction that will service the facilities